Getting caught up with the little projects. Added drains for the dorades. I used 7/8-inch pipes epoxied in place - this gives a very nice and robust drain. I also used the same pipe as conduit in the dorades for routing the wires to the nav lights that will eventually be installed. I also made covers for the compass and the Depth/Speed instruments. Now that all the wiring has been decided on, it was time to get the seatbacks in place. Filling the spaces with foam wasn't as messy as I feared. I used my nail gun to attach the panels to the frames. Now I'm fairing the edges in preparation for the seatback top piece.