Back to work...

A few projects, a trip to Minnesota and some summer sailing has kept me too busy to work on the boat, but I was able to spend some time on it today.

Since the last post I managed to get conduit installed.  I also installed a drainplug in bulkheads 1 and 8.  







Today I installed the floorboards.  I made these from western red cedar and covered them with 5 coats of varnish.  I think they look good!




Comments

Popular posts from this blog

Getting started...

Varnishing the floorboards...

First Bulkheads